電壓擊穿試驗(yàn)儀-擊穿電壓儀 安裝條件:
電源: 220V±10%的單相交流電壓和50Hz±1%的頻率
10、電源電壓穩(wěn)定度外界電源電壓波動(dòng)≤10%
11發揮作用、長(zhǎng)×寬×高700mm×800mm×1650mm
12良好、設(shè)備自重: 100kg
13、運(yùn)行環(huán)境溫度:15 ~ 30℃銘記囑托,相對(duì)濕度:30%~85%能夠穩(wěn)定運(yùn)行引領。
14、接地要求儀器需要單獨(dú)接地示範,接地附合國(guó)家標(biāo)準(zhǔn)要求
15應用前景、接地電阻要求≤4Ω(用戶實(shí)驗(yàn)室自行準(zhǔn)備)
電壓擊穿試驗(yàn)儀-擊穿電壓儀技術(shù)參數(shù)
1 試驗(yàn)變壓器
1.1 輸出電壓: AC ?0-10000V,DC 0-10000V運行好;
1.2 輸入電壓:220v
1.3 額定容量下首次,長(zhǎng)期連續(xù)運(yùn)行;
1.4 zui大輸出電壓下部署安排,PD≤1pC搖籃;
1.5 噪聲≤58dB(1m位置測(cè)量)。
2 調(diào)壓器
2.1 輸入電壓:220V推廣開來;
2.2 額定容量:2kVA(如果有補(bǔ)償推動,可以小于15kVA,但不小于10kVA)資源配置;
2.3額定容量下信息,長(zhǎng)期連續(xù)運(yùn)行;
2.4噪聲≤58dB(1m位置測(cè)量);
2.5 電動(dòng)調(diào)壓大力發展。
3 高壓分壓器
3.1 高壓臂電容:1nF豐富內涵;
3.2 分壓比:700(可討論,結(jié)合測(cè)量控制系統(tǒng))不同需求;
3.3 額定容量下發展,長(zhǎng)期連續(xù)運(yùn)行;
3.4 zui大輸出電壓下總之,PD≤1pC面向;
3.5 測(cè)量精度:1%。
4 計(jì)算機(jī)控制
4.1 藍(lán)牙連接同時;
4.2 安全保護(hù)互動式宣講;
5 試驗(yàn)電極
5.1 滿足GB/T 1408-2006 絕緣材料電氣強(qiáng)度試驗(yàn)方法效高性;
5.2 滿足GB/T 1695-2005 硫化橡膠工頻電壓擊穿強(qiáng)度和耐壓強(qiáng)度試驗(yàn)。
電壓擊穿試驗(yàn)儀-擊穿電壓儀技術(shù)指標(biāo):
輸入電壓: 交流 220 V 輸出電壓: 交流 0--100 KV ;/直流 0—100 KV
電器容量: 10KVA 高壓分級(jí): 0-100KV 升壓速率:0.01-5.0kv
(備注:滿足標(biāo)準(zhǔn)要求并可以根據(jù)用戶需求設(shè)定不同的升壓速率)
06自動化、試驗(yàn)方式: 交流試驗(yàn)/?直流試驗(yàn):1提升、勻速升壓? 2、梯度升壓 3不折不扣、耐壓試驗(yàn)
試驗(yàn)介質(zhì):空氣支撐能力,試驗(yàn)油 安裝靈敏度較高的過(guò)電流保護(hù)裝置保證試樣擊穿時(shí)在0.05S內(nèi)切斷電源。 儀器配備先進(jìn)的故障報(bào)警系統(tǒng) 避免用戶操作故障儀器發(fā)生危險(xiǎn)高效利用。(上位機(jī)報(bào)警和下位機(jī)報(bào)警
電壓擊穿試驗(yàn)儀-擊穿電壓儀使電介質(zhì)擊穿的電壓特征更加明顯。電介質(zhì)在足夠強(qiáng)的電場(chǎng)作用下將失去其介電性能成為導(dǎo)體,稱(chēng)為電介質(zhì)擊穿,所對(duì)應(yīng)的電壓稱(chēng)為擊穿電壓。
電介質(zhì)擊穿時(shí)的電場(chǎng)強(qiáng)度叫擊穿場(chǎng)強(qiáng)講理論。不同電介質(zhì)在相同溫度下,其擊穿場(chǎng)強(qiáng)不同的可能性。當(dāng)電容器介質(zhì)和兩極板的距離d一定后,由U1-U2=Ed知,擊穿場(chǎng)強(qiáng)決定了擊穿電壓。擊穿場(chǎng)強(qiáng)通常又稱(chēng)為電介質(zhì)的介電強(qiáng)度服務為一體。
提高電容器的耐壓能力起關(guān)鍵作用的是電介質(zhì)的介電強(qiáng)度問題。附表為各種電介質(zhì)的相對(duì)介電常量εr和介電強(qiáng)度。電介質(zhì)εr擊穿場(chǎng)強(qiáng),×106/(V·m-1)
絕緣材料電壓擊穿試驗(yàn)儀-擊穿電壓儀
[容量(kVA)]/[輸出電壓( kV)]?油浸式試驗(yàn)變壓器
常規(guī)型號(hào) 1.5/50 3/50 5/50 10/50
20/50 30/50 40/50 50/50 10/100
20/100 30/100 40/100 50/100 20/150
30/150 40/150 50/150 100/150 50/200
100/200 150/200 200/200 300/200 50/300
100/300 150/300 200/300 300/300
說(shuō)明:以上是常規(guī)型號(hào)全會精神,也可以按照客戶特定參數(shù)定制系統穩定性。
- 擊穿試驗(yàn)breakdown test; flash (ing) test; spark-over test; disruptive test
- 操作步驟operating steps
- 快捷圖標(biāo)short-cut icon
- 交流電壓alternating voltage
- 高壓硅堆high voltage silicon rectifier stack; high-voltage silicon stack
- 測(cè)試回路test loop; testing loop
- 直流電壓volts d.c.; direct voltage
- 高壓變壓器high tension transformer; high-voltage transformer (HVT); high voltage transformer
- 高壓絕緣high-voltage insulation; high voltage insulation
- 測(cè)試電路test circuit; test connection
Operation procedure of voltage breakdown tester:
1. Preparation before test: 1) open the main power switch on the right side of the test machine and preheat for 15 minutes. 2) turn on the computer and enter the Windows system. Double click the instrument software shortcut icon, open the test login screen, enter the login password, you can enter the test interface.
2 、 AC and DC test switch 1) this instrument high voltage output is AC voltage. The way to obtain DC is to connect the high voltage silicon stack into the original circuit, so that the test circuit is a pulsating DC voltage. The implementation process, has been in a high voltage silicon stack transformer insulation tower, usually with a short rod, short circuit high-voltage silicon stack. When the DC test is needed, the short circuit rod is removed so that the high voltage silicon stack is connected to the test circuit, and the voltage of the circuit is a pulsating DC voltage.
2) front panel DC AC select button. The status of the button cannot change the voltage characteristic of the device output. Press this button, the device is only to connect the DC alarm circuit. Instructs the user when you open the door of the box, you need to discharge the ball evenly under high pressure. Turn off the pole so that the end of the pole is in contact with the high-pressure ball. It is recommended that each user discharge copper balls in contact with high pressure equal pressure ball for more than five seconds.
3) the AC / DC voltage switching of the test mainly depends on whether the short rod in the high voltage insulated tower is taken out. When the short circuit rod is taken out, the voltage on the ball is a direct current voltage, and when the short circuit rod is inserted, the voltage on the high voltage equalizing ball is an alternating voltage. Take out the short pole and insert it. See the diagram on the left.
4) in the DC test, the computer should also choose the DC state, otherwise the result of measurement is incorrect. In brief, the AC voltage is twice as much as the DC voltage.
Voltage breakdown test instrument is a high voltage output device. Installation, movement and use should pay special attention to the safety of people and equipment. Please note the following:
1 equipment must be connected to 16A single-phase 220V AC socket.
2 one of the two grounding terminals of the equipment must be connected to the ground wire of the distribution box through a dedicated earth wire.
3 before use, one of the two grounding terminals must be connected with the discharge rod.
4 in the test, if the observation current is maintained at 20-30mA for a long time, the test should be stopped immediay so as not to overload the fire tube.
5 a test finished, be sure to unplug the residual charge and then put off the high voltage output end of the bar.
6, in case of emergency, should immediay press "emergency stop" button, power failure.
7 do not use for a long time, disconnect all power lines.
8, handling can not tilt too large angle, so as not to transformer oil flow.
In 9 samples, make sure you've let the electric discharge rod, and the power is disconnected.
10 test process, in case of fire, be sure to break the power supply, and then extinguish the fire.