国产一级一级理论片一区二区_久久综合图区亚洲综合图区_国产精品V欧美精品av日韩_日韩精品成人在线_亚洲欧美日韩动漫_国产精品一二三区在线观看公司_日韩成人无码一区二区三区


免費(fèi)注冊(cè)快速求購(gòu)


分享
舉報(bào) 評(píng)價(jià)

JZ-2D 電動(dòng)土工擊實(shí)儀榮計(jì)達(dá)

參考價(jià)面議
具體成交價(jià)以合同協(xié)議為準(zhǔn)

該廠商其他產(chǎn)品

我也要出現(xiàn)在這里

電動(dòng)擊實(shí)儀具有輕型擊實(shí)和重型擊實(shí)功能堅持先行,適用于試驗(yàn)室和現(xiàn)場(chǎng)土工試驗(yàn)用產業。適用于公路、鐵路情況較常見、水利可持續、建筑地基填土工程設(shè)計(jì),以標(biāo)準(zhǔn)擊實(shí)方法在一定的擊實(shí)功下體製,測(cè)定土的含水量與干密度之關(guān)系構建。

詳細(xì)信息 在線詢價(jià)


電動(dòng)擊實(shí)儀具有輕型擊實(shí)和重型擊實(shí)功能,適用于試驗(yàn)室和現(xiàn)場(chǎng)土工試驗(yàn)用服務延伸。適用于公路共創輝煌、鐵路、水利進一步、建筑地基填土工程設(shè)計(jì)大部分,以標(biāo)準(zhǔn)擊實(shí)方法在一定的擊實(shí)功下,測(cè)定土的含水量與干密度之關(guān)系實際需求。
The multifunctional electric compactor has light compaction and heavy compaction functions, and is suitable for laboratory and field geotechnical tests. It is suitable for highway, railway, water conservancy, and construction foundation filling engineering design. The standard compaction method is used to determine the relationship between soil moisture content and dry density under a certain compaction work.

電動(dòng)擊實(shí)儀符合(GB-7960/87)標(biāo)準(zhǔn)解決方案,是根據(jù)頒發(fā)的公路試驗(yàn)行業(yè)標(biāo)準(zhǔn)(T0131-93)研制的機(jī)電一體化儀器,其結(jié)構(gòu)性能符合承載比試驗(yàn)(CBR)(T0134-93)善謀新篇,回彈模量試驗(yàn)(T0135-93)中的擊實(shí)試驗(yàn)試件制作要求增產。
The multifunctional electric compactor complies with the (GB-7960 / 87) standard. It is a mechatronics instrument developed in accordance with the Highway Test Industry Standard (T0131-93) issued by the Ministry of Communications. T0134-93), requirements for making compaction test specimens in rebound modulus test (T0135-93).

電動(dòng)擊實(shí)儀技術(shù)指標(biāo):
★重型擊實(shí)試驗(yàn):
部標(biāo):錘重4.5千克便利性;落錘高度450毫米 
國(guó)標(biāo):錘重4.5千克;落錘高度457毫米
★輕型擊實(shí)試驗(yàn):
部標(biāo): 錘重2.5千克行動力;落錘高度300毫米 
國(guó)標(biāo): 錘重2.5千克提供有力支撐;落錘高度305毫米
適用試模筒直徑:
部標(biāo): Φ100毫米;Φ152毫米 
國(guó)標(biāo): Φ102毫米統籌;Φ152毫米
★錘頭直徑:
部標(biāo):Φ50毫米 
國(guó)標(biāo):Φ51毫米
錘擊速度:30次/分
電機(jī)規(guī)格:380伏最深厚的底氣;550瓦協同控製;1400轉(zhuǎn)/分
Technical indicators of multifunctional electric compactor:
★ Heavy compaction test:
Ministry standard: hammer weight 4.5 kg; drop weight height 450 mm
National standard: hammer weight 4.5 kg; drop weight height 457 mm
★ Light compaction test:
Ministry standard: Weight of 2.5 kg; drop weight height of 300 mm
National standard: hammer weight 2.5 kg; drop weight height 305 mm
Applicable test tube diameter:
Ministry standard: Φ100mm; Φ152mm
National standard: Φ102 mm; Φ152 mm
★ Hammer diameter:
Ministry standard: Φ50 mm50
National standard: Φ51 mm
Hammering speed: 30 times / minute
Motor specifications: 380 volts; 550 watts; 1400 rpm

電動(dòng)擊實(shí)儀操作規(guī)程:
★根據(jù)使用試筒的直徑大小振奮起來,調(diào)整好工作臺(tái)的位置,開機(jī)前先用人工提放一下?lián)魧?shí)錘利用好,確認(rèn)試模邊緣不受擊實(shí)為準(zhǔn)深入各系統。
★取制備好的土樣分3-5次倒入筒內(nèi)。小筒按三層法時(shí)系列,每次約800-900g作用;按五層法時(shí),每層需試樣約400-500g統籌推進。大筒使用時(shí)方案,應(yīng)先將墊塊放入筒內(nèi)底板上,按五層法時(shí)了解情況,每層需試樣約900-1100g深入;按三層法時(shí),每層需試樣約1700g左右重要的。整平表面開展研究,并稍加壓緊,然后按規(guī)定的擊實(shí)數(shù)進(jìn)行置數(shù)并啟動(dòng)進(jìn)行擊實(shí)相互融合。擊實(shí)時(shí)擊實(shí)錘應(yīng)自由垂直落下首要任務,錘跡必然均勻分布于土樣面,層擊實(shí)完后不同需求,將試樣層面“拉毛”發展,然后按“復(fù)位”鍵,重復(fù)上述方法進(jìn)行其余各層土的擊實(shí)總之。
★擊實(shí)完成后宣講活動,用修土刀沿套筒內(nèi)壁削刮,使試樣與套筒脫離后工藝技術,扭動(dòng)并取下套筒效率,齊筒頂細(xì)心削平試樣,擦凈筒外壁近年來,稱量講道理。用脫模器進(jìn)行脫模發展目標奮鬥,從試樣中處取樣測(cè)其含水量。
★注意使用小筒擊實(shí)之前更多的合作機會,上下插好擊實(shí)頭插桿延伸;使用大筒擊實(shí)之前,拔除上下插桿服務好。
Multifunctional electric compactor operating procedures:
★ Adjust the position of the worktable according to the diameter of the test cylinder. Before starting, manually lift the compaction hammer to confirm that the edge of the test mold is not compacted.
★ Take the prepared soil sample and pour it into the tube in 3-5 times. When the small tube is in the three-layer method, it is about 800-900g each time; in the five-layer method, the sample is about 400-500g in each layer. When using the large cylinder, the spacer should be placed on the bottom plate of the cylinder first. According to the five-layer method, each layer needs about 900-1100g of samples; when the three-layer method is used, each layer needs about 1700g. Level the surface, apply a little pressure, and then set it according to the specified number of compactions and start compaction. The real-time compaction hammer should fall freely and vertically, and the hammer marks must be evenly distributed on the soil sample surface. After the layer compaction is completed, the sample layer is "pulled", and then the "reset" key is repeated. Compact.
★ After the compaction is completed, scrape along the inner wall of the sleeve with a trowel to detach the sample from the sleeve, twist and remove the sleeve, carefully flatten the sample with the top of the cylinder, wipe the outer wall of the cylinder, and weigh. Use a demoulder to demold, and take a sample from the sample to measure its water content.
★ Pay attention to inserting the plug of the compaction head up and down before using the small tube;

電動(dòng)擊實(shí)儀調(diào)試:
★將本機(jī)放置在平整的水泥地面上新趨勢。
★將主機(jī)上伸出的導(dǎo)線接到控制器后面板的輸出端。(10芯)
★將電源線接到控制器后面板的輸入端共謀發展。(4芯)
★將電源線插頭插上電源上學習。
★按下控制器上的置數(shù)/啟動(dòng)鈕,使之處于置數(shù)狀態(tài)市場開拓。
★撥動(dòng)置數(shù)盤措施,使之為03。
★按下電源開/關(guān)鈕要落實好,電源接通緊密相關。
★按置數(shù)/啟動(dòng)鈕,使之彈起先進技術,機(jī)器開始運(yùn)轉(zhuǎn)培訓。
★待自動(dòng)停機(jī)后,若擊實(shí)錘被提起宣講手段,則接線正確重要工具,可正常工作上高質量;若擊實(shí)錘落在試筒內(nèi)技術交流,則電機(jī)是反轉(zhuǎn),應(yīng)將電源插頭的任意兩根火線調(diào)換位置統籌推進,再次試機(jī)對外開放,直到自動(dòng)停機(jī)后擊實(shí)錘處于提起位置技術創新。
Multifunctional electric compactor debugging:
★ Place the machine on a flat concrete floor.
★ Connect the wires protruding from the host to the output of the rear panel of the controller. (10 cores)
★ Connect the power cord to the input terminal on the rear panel of the controller. (4 cores)
★ Plug the power cord into the power supply.
★ Press the setting / start button on the controller to make it set.
★ Set the dial to 03.
★ Press the power on / off button to turn on the power.
★ Press the setting / start button to make it pop up and the machine will start to run.
★ After the machine stops automatically, if the hammer is lifted, the wiring is correct and it can work normally; if the hammer is dropped in the test cylinder, the motor is reversed, and any two live wires of the power plug should be replaced. Test the machine until the hammer is in the raised position after automatic shutdown.


同類產(chǎn)品推薦


提示

×

*您想獲取產(chǎn)品的資料:

以上可多選示範,勾選其他應用前景,可自行輸入要求

個(gè)人信息:

丰县| 金堂县| 霍城县| 屏南县| 琼海市| 阳城县| 江川县| 务川| 泌阳县| 格尔木市| 溧水县| 江安县| 仪陇县| 平安县| 漠河县| 温州市| 平遥县| 旺苍县| 平潭县| 仙游县| 邵阳县| 潍坊市| 长治市| 乳源| 普安县| 龙井市| 孝义市| 珠海市| 张家港市| 日喀则市| 稻城县| 平罗县| 左云县| 仁怀市| 平凉市| 江华| 老河口市| 鹰潭市| 额济纳旗| 博罗县| 红桥区|